Coordinates of Treatment Plant Projects
Project |
Location |
Size |
Mgal per Dig. |
Shape |
Coordinates |
|
Status |
involvement |
---|---|---|---|---|---|---|---|---|
Kim Chuan STW |
Singapore |
3 x 5000m3 |
1.32 |
ESD |
” 1° 20′ 40.17″”N” |
“103° 53′ 42.89″”E” |
completed 1999 |
structural design |
Seletar STW |
Singapore |
6 x 6500m3 |
1.72 |
ESD |
” 1° 24′ 09.96″”N” |
“103° 51′ 28.93″”E” |
completed 1996 |
structural design |
DC WASA |
Washington D.C., USA |
8 x 17,500m3 |
4.62 |
ESD |
“38° 48′ 52.20″”N” |
” 77° 01′ 29.14″”W” |
planned |
client preliminary engineering |
KA Grosslappen |
Munich, Germany |
4 x 15,000m3 |
3.96 |
DCCSD |
“48° 12′ 42.00″”N” |
” 11° 37′ 34.00″”E” |
compelted 2007 |
structural design |
Terminal Island STW |
Los Angeles, California, USA |
4 x 5400m3 |
5.39 |
ESD |
“33° 44′ 36.45″”N “ |
“118° 15′ 44.73″”W” |
completed 1978 |
redesign for VSL |
Woodman Point STW |
Perth, W.A. |
2 x 8000m3 |
2.11 |
ESD |
“32° 08′ 18.00″”S” |
“115° 46′ 16.00″”E” |
completed 1996 |
structural design |
KA Neuwerk |
Mönchengladbach, Germany |
1 x 9000m3 |
2.38 |
ESD |
51° 14′ 26.50”N |
” 6° 28′ 04.76″”E” |
completed 2000 |
structural design |
Pali STW |
Taipei, Taiwan, R.o.C. |
6 x 9400m3 |
2.48 |
ESD |
“25° 09′ 29.67″”N” |
“121° 24′ 21.93″”E” |
completed 1994 |
structural design |